Client / Funding Partner: Various Government Entities (Department of Urban Development and Building Construction [DUDBC], Infrastructure Development Offices [IDO], Tourism Development Project [TDP], Municipalities, and Rural Municipalities) Location: Gandaki, Bagmati, Koshi, and Madhesh Provinces, Nepal Combined Scale: Over 220 km of Road Infrastructure and Urban Corridors Total Consulting Service Value: NRs. 15.6 Million+
Niyatra Consult Pvt. Ltd. has executed comprehensive engineering survey, design, geotechnical investigation, environmental assessment, and Detailed Project Report (DPR) preparation for over 220 kilometers of diverse road and transport infrastructure across Nepal. The portfolio covers high-altitude mountain corridors, major municipal ring roads, urban asphalt networks, eco-tourism cycle tracks, and strategic provincial highways.
The combined scope spans the complete engineering lifecycle from initial alignment selection to finalized tender-ready documentation, delivering resilient and cost-effective transportation infrastructure adapted to varied topographic and climate conditions.
Topographical Survey & Geometric Design:
Conducted extensive total station and GPS alignment surveys across high-altitude, hilly, and plain terrains.
Formulated horizontal and vertical geometric alignment designs, longitudinal profiles, and cross-sections in compliance with Nepal Road Standards (NRS) and urban infrastructure guidelines.
Hydrological Modeling & Structural Engineering:
Estimated watershed runoff and flood discharge to size cross-drainage structures, including pipe culverts, slab culverts, causeways, and side drains.
Designed civil and structural stabilization works such as masonry retaining walls, breast walls, gabion structures, and slope protection measures.
Traffic Forecasting, Geotechnics & Pavement Design:
Performed subgrade soil sampling, California Bearing Ratio (CBR) testing, and local material quarry assessments.
Conducted 20-year traffic volume forecasting and axle load analyses to design flexible, asphalt, and gravel pavement structures.
Environmental & Social Assessments:
Executed Initial Environmental Examinations (IEE) and Brief Environmental Studies (BES) to integrate mitigation measures for slope stability, erosion control, and bio-engineering.
Conducted public consultations, stakeholder workshops, and socio-economic baseline studies.
Costing, BoQ & Procurement Packaging:
Prepared detailed rate analyses based on respective district and provincial norms.
Delivered itemized Bills of Quantities (BoQ), engineer’s estimates, AutoCAD working drawings, and standard bidding documents for construction procurement.
| SN | Road Section | Client | Location | Length |
| 1 | Hulaki Odar Meta Road Detail Survey, Design & Estimation | Client | Chame, Manang | 13.0 km |
| 2 | Kaliraha to Ghartigaun Road Mid-Hill Highway Link DPR | Rainas Municipality | Lamjung | 13.3 km |
| 3 | Bhimeshwor Core City Road & DrainDetail Design & DPR | DUDBC Division Office | Charikot, Dolakha | 7.158 km |
| 4 | Bishnupaduka-Chandibazar-Dilungtar Road Survey, Design & Estimation | Sangurigadhi Rural MunicipalityDUDBC Division Office | Dhankuta | 12.3 km |
| 5 | Annapurna Rural Municipality Ring Road Survey, Design & DPR | Annapurna Rural Municipality | Kaski | 41.0 km |
| 6 | Hilepani-Bhalukhop & Kushbaseri RoadDetail Design & DPR | Ramechhap Municipality | Ramechhap | 22.5 km |
| 7 | Makalu Rural Municipality Road Corridors 3 Road Stretches DPR | Makalu Rural Municipality | Sankhuwasabha | 8.38 km |
| 8 | Beni-Pakhapani-Malkawang RoadSurvey, Design & DPR (Design Vol: NRs. 80.81 Cr) | IDO Myagdi | Myagdi | 13.316 km |
| 9 | Itahar Bypass & Connecting Roads Survey, Design, DPR & IEE Study | Karaimai Rural Municipality | Bara | 8.923 km |
| 10 | Chitlang-Daman Foot Trail & Cycle TrackTourism Track Master Plan DPR | Tourism Development Project (TDP) | Makawanpur | 20.0 km |
| 11 | Yasok Solmari & Kabilale Road SectionsDetail Engineering & DPR | IDO Panchthar | Panchthar | 23.7 km |
| 12 | Sankranti Bazar-Sandu-Bhandaridanda Road Survey, Design & Cost Estimate | IDO Sankhuwasabha | Terhathum | 27.94 km |
| 13 | Birtamod Asphalt Roads & Urban Infrastructure Integrated Urban Development Program | PUDBC Jhapa | Jhapa | 14.0 km |